Skip to Content

Reporting & Services

The recordings papers and various reports will be daily made then archived by the Data Engineer or the Unit Manager.

The Unit Manager will realise the following documents :

  • Daily Morning Report
  • Monthly Personnel and Equipment Status
  • Attachment File for Personnel
  • Geological Log
  • Final Well Report.
     

WELLSITE SERVICES

  • Sample collection at prescribed intervals.
  • Sample description and geological analysis.
  • Interpretation of all gas information.
  • Production of Formation Evaluation Log as required.
  • Daily geological / engineering Morning Reports to Client’s specifications.
  • Sample handling, packing, recording and description as required.

QUALIFIED AND EXPERIENCED PERSONNEL
All DIAMOCO SURFACE LOGGING’ proposed field staff are Geology or Petroleum graduates and are well trained and experienced in the practical and theoretical aspects of Mud Logging, including Wellsite geology, core analysis, pressure evaluation, drilling analysis and safety. They will use these skills to assist the Client’s representative to improve the safety and efficiency of the drilling operation. The staff is all capable of installation, operation and routine maintenance of the equipment.
Personnel CVs will be submitted for approval 2 weeks prior Spud Date.
No subcontracting will be used to perform the work.

HEALTH & SAFETY POLICY
DIAMOCO SURFACE LOGGING and all itsemployees, and subcontractors if applicable, will comply with Customers Safety Procedures.
A safety meeting will be organized prior to Spud Date.

Non Exhaustive List of Safety equipment provided to DIAMOCO SURFACE LOGGING’ crew :

  • Hard Hat
  • Safety Boots
  • Gloves
  • Glasses
  • Safety Coverall

Most of our personnel are First Aid qualified.
MSDS of all chemicals and dangerous products available in the unit.

HEALTH & SAFETY MANUAL AVAILABLE IN EACH UNIT.

INSURANCE
DIAMOCO SURFACE LOGGING is covered by DIAMOCO Civil Responsibility.

The recordings papers and various reports will be daily made then archived by the Data Engineer or the Unit Manager.
The Unit Manager will realise the following documents :

  • Daily Morning Report
  • Monthly Personnel and Equipment Status
  • Attachment File for Personnel
  • Geological Log
  • Final Well Report.
randomness